Steel Beams Installed for Third Floor Balcony

On Monday, September 12th, crews installed the steel beams needed for the balcony. The beams were lifted by a huge crane and

Steel Beams Installed for Third Floor Balcony2022-09-14T19:13:37-04:00

Johnson Hall Floor Assembly

Since the install of the structural steel members, LVL beams are being placed as the first component of the floor assembly. LVL’s,

Johnson Hall Floor Assembly2022-08-29T12:46:20-04:00

Installing Structural Steel at the 3rd Floor

CV Metal Services and Ganneston Construction installing structural steel at the third floor It was discovered that the existing carrying

Installing Structural Steel at the 3rd Floor2022-08-03T11:44:37-04:00

Johnson Hall Renovations Underway!

If you walk by Johnson Hall, you may hear the work being done, but not see it. Take a look through the

Johnson Hall Renovations Underway!2022-06-13T13:01:44-04:00

Interior Renovations Begin

Interior renovations began at Johnson Hall on April 8, 2022 with a construction kick-off event. This was Phase Two of the renovation.

Interior Renovations Begin2024-03-14T13:58:40-04:00